• Resolved gregsgraphics

    (@gregsgraphics)


    Hi Frank,

    Trying the plugin. I can have the options checked for Optimize Javascript and Optimize CSS, but when Optimize HTML is checked, the homepage is a plain white page. That’s one issue we could address later.

    I have advanced settings on, and under CSS, under “Inline and Defer CSS?”, I have “Inline “above the fold CSS” checked.

    I used the Critical Path CSS Generator site to get the Critical Path CSS, and copied the provided code into the field, saved settings and cleared caches.

    When I view the source code in a browser, the single line CSS link is still there, instead of being embedded.

    What could be happening?

    My client’s site is http://www.chefgorji.com
    We are using the Nosh restaurant theme from Themecanon.
    All plug-ins are up-to-date.

    Thanks in advance!

    https://ww.wp.xz.cn/plugins/autoptimize/

Viewing 5 replies - 1 through 5 (of 5 total)
Viewing 5 replies - 1 through 5 (of 5 total)

The topic ‘Critical Path CSS Setting Not Working?’ is closed to new replies.