Often doesn’t change order values
-
I am finding that the plugin will often leave posts with the same order value as other posts after dragging, which means they won’t necessarily actually be in the correct order. Here’s a video of me trying to reorder some posts:
https://www.dropbox.com/s/shgxcn39dhpl19z/SCPO.mov?dl=0
Twentyseventeen with a CPT created with Pods. I drag and drop to reorder, then reload the page to see if the order will stick.
Viewing 3 replies - 1 through 3 (of 3 total)
Viewing 3 replies - 1 through 3 (of 3 total)
The topic ‘Often doesn’t change order values’ is closed to new replies.