Subscription Switching not calculating correctly
-
We have a variable subscription that is set to renew on the 1st of each month. We’ve set up subscription switching so they can upgrade the sub to a higher level at any time. However, the switching feature doesn’t factor in the amount of money already charged. For example, upgrading from a 1000/mo subscription to a 2000/mo subscription:
1000 = 32.258/day
322.58 spent in 10 days
677.42 left for the monthupgrading to:
2000 = 64.516/day
1354.84 for 21 remaining days – this is what it is charging
but it needs to subtract the 677.42 already paid from the previous subscription677.42 is what it should be charging for the upgrade and not 1354.84
Can anyone help with this?
The page I need help with: [log in to see the link]
The topic ‘Subscription Switching not calculating correctly’ is closed to new replies.