Forum Replies Created

Viewing 2 replies - 1 through 2 (of 2 total)
  • Thread Starter Coign IT Solutions

    (@coign-it-solutions)

    Thanks again.

    I must have missed that in the FAQs.

    Yesterday I forced a large number of changes to the website. However, the scheduled backup failed to complete again. In the “backup” tab of the admin area it showed that the SQL part of the backup hadn’t completed and was only about 2/3rds done.

    Is there a way I can get any extra logging information out. Each time I’ve viewed the log in the Seldex directory it has only shown the forced backups.

    Thread Starter Coign IT Solutions

    (@coign-it-solutions)

    Thanks for getting back so quickly.

    The last backup was scheduled for Saturday midnight and I checked this morning. So it had been stuck for about 33 hours. Whenever I force a backup it lasts only a matter of seconds (6-8s).

    I have the size of the backup pretty small so only a single file is created. Also as the website has very little content the file is just less than 2mb.

    Additionally, the site isn’t attracting traffic yet as I work on it. So only has me visiting through the working day. The backup is scheduled at midnight so isn’t getting any hits at that time.

Viewing 2 replies - 1 through 2 (of 2 total)